GP Building

To make way for the STEMM Precinct and as part of our draft Campus Masterplan for Callaghan, the McMullin building has been earmarked for demolition in 2020. As such, IFS have a program of relocations and refurbishments for current occupants of the building.

One such group who recently moving to their new home in the GP building is the team from English Language and Foundation Studies (ELFS). The group worked collaboratively with the team in IFS to design their new office and teaching spaces. The refurbishment provided the group with the essential front facing student hub and social spaces as well as office space, meeting rooms and a staff kitchen.

The refurbishment gave a fresh and vibrant look to an old interior.